Free Microsoft Data Engineering DP-700 Actual Exam Questions - Question 7 Discussion
You have a Fabric deployment pipeline named deployPipeline1 that deploys items from Workspace1
to Workspace2. DeployPipeline1 contains all the items in Workspace1.
You recently modified the items in Workspaces1.
The workspaces currently contain the items shown in the following table.

Items in Workspace1 that have the same name as items in Workspace2 are currently paired.
You need to ensure that the items in Workspace1 overwrite the corresponding items in Workspace2.
The solution must minimize effort.
What should you do?
A/C? Deleting or backing up first covers all bases if overwrite isn’t default.
It’s D because items paired by name usually get overwritten automatically during deployment.
It’s D because the pipeline pairs items by name, so running it should overwrite existing items in Workspace2. No need to delete or rename anything since that adds unnecessary steps.
Option D makes the most sense here. Since the items are already paired by name, the deploy pipeline should overwrite the matching items in Workspace2 without extra work. Deleting everything in Workspace2 (option A) feels like overkill and could risk losing unpaired items. Renaming items in Workspace2 (option B) doesn’t seem necessary because pairing is based on names, and backing up (option C) is just a precaution, not a must for the deployment itself. Running deployPipeline1 as is should do the job efficiently.
Probably D. Usually deployment pipelines are designed to update existing items by default if they’re paired. Since the items with the same name are already paired, running the pipeline should overwrite Workspace2’s items without extra steps. Deleting or renaming seems unnecessary and more work. If the pipeline didn’t overwrite, it wouldn’t really serve its purpose. So just running deployPipeline1 should do it.
A/D? Deleting all items in Workspace2 seems extreme and time-consuming. Usually, deployment pipelines handle overwriting paired items automatically, so running deployPipeline1 without changes (D) should work fine.
A vs D? If overwriting is default, no need to delete Workspace2 items first.
D imo, deploy pipelines usually overwrite paired items by default when deployed.
Option D—deployPipeline1 should overwrite paired items by default without extra steps.
Does "overwrite" mean deployPipeline1 automatically replaces existing items?