Free Cisco 300-425 ENWLSD Actual Exam Questions - Question 7 Discussion
Question No. 7
An engineer is implementing a wireless design for a service provider. The design includes a Catalyst
9800, a stack of two Catalyst 9300X-
48HX switches, and 9166 APs. Each AP must be named using the Floor-439412509-01X sting where X
is the area number. The engineer wants
to connect the APs to the switch stack using POE. How many APs must the engineer connect to the
stack so the APs run using full functionalities?
9800, a stack of two Catalyst 9300X-
48HX switches, and 9166 APs. Each AP must be named using the Floor-439412509-01X sting where X
is the area number. The engineer wants
to connect the APs to the switch stack using POE. How many APs must the engineer connect to the
stack so the APs run using full functionalities?
Select one option, then reveal solution.
US
ZG
Zain G.
2026-02-19
B/C? If the APs need full PoE, one switch might not cut it, but using all ports on both seems overkill. Maybe just one switch fully loaded is enough before stacking adds more power.
0
PP
Peter P.
2026-01-29
D imo, spreading the APs across half the ports on each switch sounds like a better power management strategy. Using all ports might waste power if the budget per port is limited. Plus, connecting half the ports per switch should still provide enough POE to keep all APs fully functional without overloading a single switch.
0
IO
Irfan O.
2026-01-19
D imo, half ports per switch might be enough to spread the power load evenly. Connecting all ports seems overkill unless explicitly required.
0
ZU
Zain U.
2026-01-15
C/D? Full functionality probably needs all ports for power distribution.
0
ZU
Zain U.
2026-01-15
Maybe D
0