Question No. 11
An architect was in an architectural workshop and noted the following business objectives:
The solution must prioritize optimal end-to-end user shopping experience for customers accessing
the website.
The website must be available 24 x 7 x 365.
Which three conceptual model items relate to these business objectives? (Choose three.)
Select all that apply, then reveal solution.
US
IS
Imran S.
2026-02-16

A/C/E fits best—availability at app and network layers plus downtime constraint.

0
FU
Farhan U.
2026-02-01

A/C/E? A and C tie directly to the 24/7 availability requirement from different layers, and E makes sense as a constraint related to minimizing downtime during business hours. B is about risk, which feels separate from conceptual requirements or constraints. D actually contradicts the goal of optimizing user experience since site performance should matter. F might be an assumption, but it’s not clearly stated as a conceptual model item tied to the objectives given.

0
WA
Will A.
2026-01-21

Makes sense to rule out B since it’s a risk, not a direct business objective or condition. I’d focus on A for the front-end uptime requirement, C for the network layer availability, and E since limiting changes outside business hours supports 24/7 availability. Those three tie directly to keeping the site up and running smoothly, which matches the objectives. D and F look more like assumptions that don’t express concrete needs or constraints. So A, C, and E feels like the best fit here.

0
IG
Irfan G.
2026-01-19

A, C, and E since B is a risk, not a direct business objective item.

0
SZ
Shoaib Z.
2026-01-15

I’d go with A, C, and E here. A and C cover the availability requirements at different layers, and E relates to limiting changes to avoid downtime, supporting 24/7 availability. The others seem less directly tied to the business objectives stated. What do you think?