Free US Green Building Council LEED AP ID+C Actual Exam Questions
The questions for this exam were last updated on January 7, 2026
Dumps Box (DumpsBox) offers up-to-date practice exam questions for LEED AP ID+C certification exam which are developed and validated by US Green Building Council subject domain experts certified in US Green Building Council LEED AP ID+C . These practice questions are update regularly as we keep an eye on any recent changes in LEED AP ID+C syllabus, and when there is update our team quickly adjusts the questions. This commitment to providing the best quality exam prep material to certification aspirants is what makes DumpsBox.com the best certification exam prep website. On top of that, our strong, yet strictly moderated, community based feedback keeps the content clean and current. Each question has helpful community discussion that provides it extra perspective and introduces helpful resources for better exam preparation. This also saves students from other outdated practice questions or illicit exam dumps that can have adverse affects on career. Browse through our US Green Building Council LEED AP ID+C exam questions and pass your exam on first try.
A mechanical engineer needs to identify spaces that are considered densely occupied according to LEED in order to document
Select one option, then reveal solution.
Question No. 2
A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?
Select one option, then reveal solution.
Question No. 3
A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?
Select one option, then reveal solution.
Question No. 4
To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?
Select one option, then reveal solution.
Question No. 5
A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?
Select one option, then reveal solution.
Question No. 6
A project has performed an energy model which has resulted in the following energy end use consumption: To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in
Select one option, then reveal solution.
Question No. 7
What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?
Select one option, then reveal solution.
Question No. 8
Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?
Select one option, then reveal solution.
Question No. 9
According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing building should identify
Select one option, then reveal solution.
Question No. 10
If the client has purchased green power that is not Green-e certified, then the project team should
Select one option, then reveal solution.
Question No. 11
For an Interior Design and Construction project to earn Innovation Credit, LEED Accredited Professional, who must submit their credentials as a principal participant of the project team?
Select one option, then reveal solution.
Question No. 12
A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?
Select one option, then reveal solution.
Question No. 13
In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?
Select one option, then reveal solution.
Question No. 14
A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?
Select one option, then reveal solution.
Question No. 15
Occupancy numbers must be reported consistently across multiple LEED credits. Which of the following prerequisites/credits require using the Occupancy numbers?