Dumps Box (DumpsBox) offers up-to-date practice exam questions for NCSC-Level-1 certification exam which are developed and validated by NUTANIX subject domain experts certified in Nutanix NCSC-Level-1 . These practice questions are update regularly as we keep an eye on any recent changes in NCSC-Level-1 syllabus, and when there is update our team quickly adjusts the questions. This commitment to providing the best quality exam prep material to certification aspirants is what makes DumpsBox.com the best certification exam prep website. On top of that, our strong, yet strictly moderated, community based feedback keeps the content clean and current. Each question has helpful community discussion that provides it extra perspective and introduces helpful resources for better exam preparation. This also saves students from other outdated practice questions or illicit exam dumps that can have adverse affects on career. Browse through our Nutanix NCSC-Level-1 exam questions and pass your exam on first try.

Question No. 1
A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:
* Solution must follow Nutanix Best Practices
* Network configuration should be redundant
* A vSphere Standard Switch must be utilized
Which load balancing method should be used?
Select one option, then reveal solution.
Question No. 2
A customer is deploying Nutanix AHV clusters over hundreds of remote sites worldwide. Prism
Central will be used to centrally manage all clusters. Customer security policy requires the use of MS
Active Directory (AD).groups to authenticate all network devices.
Which method should be consultant use to meet the requirements?
Select one option, then reveal solution.
Question No. 3
While preparing for a new four-node cluster installation, the consultant has a Tech Review Call with
the customer. The hardware is as follows:
* 4 nodes in 1 Block
* 8 x 10 GbE Ports
* 4 x 1 GbE IPMI Ports
* Adequate Ethernet ports are available
* Ethernet cables are correct and available
* Adequate rack space is available
Which remaining item must be confirmed as available onsite?
Select one option, then reveal solution.
Question No. 4
A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured
with the Route based on physical NIC load load balancing option. The customer does not see the
option when editing the Teaming and Failover settings for the switch.
How should the consultant resolve this issue?
Select one option, then reveal solution.
Question No. 5
In a 20-node ESXi deployment, the customer needs additional resiliency to survive the loss of two
nodes concurrently.
Which configuration should the consultant use to ensure that the appropriate resources are
available?
Select one option, then reveal solution.
Question No. 6
Refer to the exhibit.
NCSC-Level-1 practice exam questions
A system administrator is using Range-Autofill tool to assign IP addresses to setup a multi-block
cluster based on the following configuration:
NCSC-Level-1 real exam questions
Which additional changes must be made during the Foundation process to configure the cluster
correctly?
Select one option, then reveal solution.
Question No. 7
Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?
Select one option, then reveal solution.
Question No. 8
A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is
configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and
migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all
CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no
longer powered on.
Which ESXi HA/DRS cluster setting is missing?
Select one option, then reveal solution.
Question No. 9
A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant
decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives
onsite, Foundation Portable is unable to locate the new nodes.
Which log should the consultant check to troubleshoot this issue?
Select one option, then reveal solution.
Question No. 10
A consultant is unable to install virtualization software on a laptop.
Which two versions of Foundation can be used to resolve this issue? (Choose two.)
Select all that apply, then reveal solution.
Question No. 11
After uploading a hypervisor ISO during the Foundation process, a consultant sees a message that
the MD5 sum for the hypervisor is not found in the Whitelist file.
Which step should the consultant take next to resolve this issue?
Select one option, then reveal solution.
Question No. 12
A Nutanix cluster has 10TB usable storage. The customer wants to create a 100GB datastore for ISO
images to eliminate too much storage being consumed by unnecessary images.
Which setting should be used to accomplish this goal?
Select one option, then reveal solution.
Question No. 13
A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:
* Networking is set to default
* Only two NICs are connected
The customer receives the following critical message:
The NIC is disconnected from the switch, or the switchport is failing.
What should the consultant verify to resolve the issue?
Select one option, then reveal solution.
Question No. 14
A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is
5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at
its current AOS version.
Which method can be used to successfully add the node?
Select one option, then reveal solution.
Question No. 15
A customer buys ultimate licensing and wants to use the built-in Nutanix software encryption on
their new AHV cluster. The customer needs to create three storage containers and asks the
consultant to complete the process as fast as possible.
In which order should the cluster be deployed?
Select one option, then reveal solution.