Dumps Box (DumpsBox) offers up-to-date practice exam questions for HPE7-A03 certification exam which are developed and validated by HP subject domain experts certified in HP HPE7-A03 . These practice questions are update regularly as we keep an eye on any recent changes in HPE7-A03 syllabus, and when there is update our team quickly adjusts the questions. This commitment to providing the best quality exam prep material to certification aspirants is what makes DumpsBox.com the best certification exam prep website. On top of that, our strong, yet strictly moderated, community based feedback keeps the content clean and current. Each question has helpful community discussion that provides it extra perspective and introduces helpful resources for better exam preparation. This also saves students from other outdated practice questions or illicit exam dumps that can have adverse affects on career. Browse through our HP HPE7-A03 exam questions and pass your exam on first try.

Question No. 1Drag & Drop

DRAG DROP You are going with a 3-tier design and need to calculate the oversubscription ratio on the Access. Distribution. Core, and ToR Layer. What is a suitable oversubscription ratio for each layer? HPE7-A03 practice exam questions

Options
A2:1
B4:1
C24:1
Drag an item to a target. Click × to remove.
Answer Area
Access
Drop item here
Aggregation
Drop item here
Core
Drop item here
TOR
Drop item here
Question No. 2Drag & Drop

DRAG DROP What documents should be included in the solution proposal? (Place the correct items into the list at the right. Order is not important. Not all options will be used) HPE7-A03 practice exam questions

Options
Aarchitect's notes from meetings
Bas-built rack drawings
Cassumptions documented in design
Dbill of materials
Edata sheets of equipment proposed
Fproposed topology diagram
Gquote
Drag an item to a target. Click × to remove.
Answer Area
1
Drop item here
2
Drop item here
3
Drop item here
4
Drop item here
5
Drop item here
6
Drop item here
7
Drop item here
Question No. 3Drag & Drop

DRAG DROP What should be Included in an Executive Summary? (Place the correct Items into the let at the right Order is no: Important Not all cottons win be used) HPE7-A03 practice exam questions

Options
Abrief summary
Bcontact information
Chigh-level design
Djob roles
Epurpose of the document
Frecommended cabling
Grecommendations
Hscope
Itarget audience
Drag an item to a target. Click × to remove.
Answer Area
1
Drop item here
2
Drop item here
3
Drop item here
4
Drop item here
5
Drop item here
6
Drop item here
7
Drop item here
Question No. 4Drag & Drop

DRAG DROP Match the deployment type with the usage scenario. HPE7-A03 practice exam questions

Options
ACapacity based design with low to mid density
BCoverage based design
CHigh-capacity design
DVery low-density, low coverage
Drag an item to a target. Click × to remove.
Answer Area
Basic office/cubicle area with low to medium user density and no voice with limited if redundancy
Drop item here
Coverage, office areas with higher user density OR basic coverage office/cubicle with High Demand users
Drop item here
High user density indoor space, with high demand users
Drop item here
Warehouses, large open areas
Drop item here
Question No. 5Drag & Drop

DRAG DROP You hired a junior engineer to assist you with a large-scale network infrastructure project. The engineer has never worked on such a complex project 'ants to better understand the role that each role that each stakeholder will play in the project. March the stakeholder title to the responsibilities that would most likely apply to their role. HPE7-A03 practice exam questions

Options
ACISO
BNetwork Design/Architecture
CNetwork Operations
DSecurity Operations
Drag an item to a target. Click × to remove.
Answer Area
responsible for supporting, troubleshooting, and monitoring the wired/wireless Infrastructure
Drop item here
responsible for Investigating IDS/IPS incidents and managing firewalls
Drop item here
responsible for establishing security policy and selecting security controls for the Infrastructure
Drop item here
responsible for authoring the low-level design, and creating the configuration to meet the technical requirements
Drop item here
Question No. 6
You are responding to the customer's RFP and are at the point of documenting design decisions that
were not specified in the RFP or the RFP questions. What are valid examples of assumptions made
that should be presented to the customer during the response? (Select three >
Select all that apply, then reveal solution.
Question No. 7
A large multinational financial institution has contracted you to design a new full-stack wired and
wireless network for their new 6-story regional office building. The bottom two floors of this facility
will be retail space for a large banking branch. The upper floors will be carpeted office space for
corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site
and will be out of scope for this project. The customer is underserved by its existing L2-based
network Infrastructure and would like to take advantage of modern best practices in the new design.
The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.
The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for
customer service, and there will be a mix of wired and wireless devices throughout the retail floors.
The corporate users will primarily use wireless for connectivity, but several wired clients, printers,
and hard VoIP phones will be In use.
The customer is also planning on renovating the corporate office space in order to take advantage of
"smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics,
and other location-based services.
The client has decided that more critical switch stacks supporting Contact Center resources will need
to support greater than 600W of CL4 PoE and have redundant power supplies These stacks will have
approximately six members.
What would be the most economical choice Aruba switch series to meet these requirements?
Select one option, then reveal solution.
Question No. 8
The customer recently found out that Aruba OS-CX switches are capable of Application Recognition.
What requirements should be fulfilled in order to do this? (Select two.)
Select all that apply, then reveal solution.
Question No. 9
ACME retail has 38 locations spread out across Ave US states and two provinces in Canad
a. They are looking to grow 20% over the next two years. They have an HO with a staff of 200
employees. The organization has eight Regional Managers and two VPs who work from home and
the road. Stores typically have 17 employees on average per location.
The two warehouses have a remote loading system and 20 employees each to load the trucks and
fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory.
The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml.
The forkllfts on the loading docks are equipped with a wireless tablet on board.
A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000
sq ft '2320 sq mi. The locations need to expand the abilities to vendors that need to add setup
displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used
wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber
connections. The inventory is all placed on the floor when it is delivered to the local store.
Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in
getting signals throughout the stores and this makes monthly inventory difficult. The organization has
a small help desk to troubleshoot issues that happen at the retail locations and PC support for the
office. The company is looking to upgrade away from the current pbx system later this year. With the
need to grow and cut costs, they are interested in moving the data to the cloud but need to get
almost real-time inventory control for the online service to function.
The network has all been wired over the last ten years, but with the new systems being all wireless,
they have seen the trend to offer wireless to all the vendors for their needs but also would like to
allow employees, guests, and contractors all to use it. With the new IT director starting next week,
the project has been set by the CTO of the company. The marketing group has asked how they can
interact with the customers and get more info, while the IT support desk needs to cut staff in halt.
The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and
you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable
company (Ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.
The customer has budget concerns but does want something that could last 7+ years.
ACME Retail is using 4-post racks. Which rack mounting kit is better suited for this project?
Select one option, then reveal solution.
Question No. 10

A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge. The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use. The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services The client would take to ensure redundant RADIUS resources in each of their three geographical regions (AMER. EMEA. and APAC) A large office location Is available in each region with sufficient VMware resources available. • Each region has between 4.435 and 5.859 clients, all of which will need to do either 802.1 X wired or wireless authentications as well as 802.1 X authentication for a single personal device on Wi-Fi. • All of the non-personal devices will also need to validate health with a local agent. • A total of 500 guests are expected to be connected on average with a maximum of 700 simultaneous connections malting use of Guest Portal for access to the internet. • TACACS authentication will also be configured for a total of 1200 evenly dispersed NADs. How many OnGuard Licenses are required in this scenario?

Select one option, then reveal solution.
Question No. 11
HOTSPOT
Based on this campus design, which layer is the most appropriate to be designed as a Border
Persona, considering an EVPN VXLAN Fabric?
HPE7-A03 practice exam questions
Question No. 12
HOTSPOT
Based on this campus design, click on the layer that is the most appropriate to be designed as a Stub
Persona, considering an EVPN VXLAN Fabric?
HPE7-A03 practice exam questions
Question No. 13
Which is true when it comes to Aruba Central licensing for gateways? (Select two.)
Select all that apply, then reveal solution.
Question No. 14
The current IT staff is used to working with legacy Aruba OS-S (ProCurve> equipment. They are
worried that they cannot handle Aruba OS-CX switches due to the different command syntax. What
are two ways to make the transition easier for them? (Select two.)
Select all that apply, then reveal solution.
Question No. 15
XYZ Regional Hospital is an integrated healthcare system of Hospitals, neighborhood health centers,
and small doctor offices. XYZ Regional Hospital has recently merged with 1x neighborhood health
centers and 1Z5 doctor branch offices. The wireless, wired access, and AAA solutions are outdated
and need to be replaced.
XYZ Regional Hospital is looking to future-proof and improve efficiency across all sites by enhancing
wired and wireless access and migrating to a centralized and unified wired/wireless and policy
management that can provide uninterrupted availability of all systems.
Locations:
- XYZ Regional Hospital Is located In New York City
- Dila Health Center Is located in City A
- Mount Health Center is located In City B
- Rock Health Center is located in City C
- Branch clinics are located at different locations across the United States
Requirements:
- Provide, via management software, one single pane of glass to manage wired and wireless LANs,
and VPNs across campus, branch, and remote via web/cloud architecture providing near real-time
insight, troubleshooting tools, and service Level performance reporting.
- Seamless integration across wired, wireless. WAN, S0-8ranch. loT
• Provide secure wireless access to all the employees of (he Regional Hospital and partners, as well
as provide wireless Internet access to medical citizens when they visit our facilities.
- All-access points must support the following features and specifications: 802.1 lax (WI-FI 6E
Certified)
- Security options Including WPZ/WPA3. 80Z.1 X with Radius secure authentication
- Identify and authenticate every wireless and wired device
- End-to-end role-based security
- Seamless mobility across the hospital tor medical teams, patients, and visitors
- Cuts Wi-Fi deployment times from days to hours and enables Zero-Touch deployments across the
site
- Establishes a resilient, future-ready network infrastructure with the intelligence, scalability, and
intuitive toolsets to meet emerging needs
- Fully redundant branch solution with dynamic path selection to the hospital
XYZ Regional Hospital is looking tor an NAC solution to address its security challenges-Requirements:
- fully redundant NAC solution for management and authentication
- wireless and wired authentication for the main hospital will be handled locally
The IT director of XYZ Regional Hospital is interested in a solution tor nurse workstation tracking.
What solution would meet the customer's requirements? (Select three.)
Select all that apply, then reveal solution.